Buffet Gold Coast Star Casino
- Buffet Gold Coast Star Casino Atlantic City
- Buffet Gold Coast Star Casino San Diego
- Buffet Gold Coast Star Casino Opening
After successfully delivering other projects for The Star in Sydney, SHAPE was appointed to deliver a complex restaurant fitout at the Gold Coast casino.
Buffet Gold Coast Star Casino Atlantic City
Client:
The Star Entertainment Group
Harvest Buffet at The Star Gold Coast (in the space formerly occupied by the longstanding Food Fantasy) is a decadent and fresh buffet, open seven days for breakfast, lunch and dinner. The stunning space boasts floor-to-ceiling windows with dreamy views of the lush pool area. Gold Coast Hotel & Casino. 4000 West Flamingo Road. Las Vegas, NV 89103. 702-367-7111 Don't let the game get out of hand. For Assistance call 800-522-4700. Gold Coast Casino Buffet - YouTube Ports O' Call Buffet Restaurant Las Vegas - Gold Coast - Deals & Info Ports O' Call Buffet - 279 Photos & 192 Reviews - Buffets - 4000 W Gold Coast Buffet - VEGAS Buffet prices (sign) - Picture of Gold Coast Hotel and Casino, Las Special Players Card Pricing Starting at.Price discounts vary by meal period. New buffet opens at The Star Hotel and Casino. 7NEWS Gold Coast. December 13, 2018 Gold Coast, QLD, Australia Gold Coast, QLD, Australia.
Buffet Gold Coast Star Casino San Diego
Designer:
Luchetti Krelle
Delivery Model:
Fixed Lump Sum
Location:
Broadbeach, QLD
Duration:
19 weeks
Project Size:
1,600 m2
The Harvest Buffet project site was located within a live casino floor, adjacent to a busy café that remained operational throughout.
Buffet Gold Coast Star Casino Opening
The scope of works consisted of:
- Complete strip out of the existing restaurant
- A full commercial kitchen
- A high-end restaurant that seats 550 people
- Private dining areas
- A full bar
- Bespoke chocolate fountain
- Custom chandeliers
- Mosaic murals
The project also required significant variations within the original deadlines. We worked alongside the design team to ensure that all design risk was mitigated and that the project could progress as required. To avoid delays to the programme, an acceleration plan was implemented which led to an on-time handover and the achievement of Perfect Delivery.